I've found that there are about 5 reasons for importing Autocad drawings into Revit
- Starting a Revit model from an Autocad design floor plan
- Referencing consultant drawings
- Inserting Site plan for locating shared coordinates and or an architectural site plan noting
- Inserting already established standard details
- Creating detail components form manufactures details
If you want to use the Autocad information in your 2d out put there is usually some prep work that you need to do.
- In Autocad export each detail to it's own file.
- In Autocad if you are going to use the detail in your 2d documentation delete all notes and dimensions
- In Autocad make sure details is centered on drawing origin (0,0)
- In Revit Verify your DWG/DWF Color to Lineweight import file is correct for your company/client
- This will be project's Model managers responsibility
Now import your Autocad drawing. There a couple of rules I've established for myself when doing this.
- Always insert Autocad drawings as links into your Revit files, the only time I break this rule is when I'm trying to create a detail components, the family editor doesn't allow you to link autocad files.
- For reference drawings put the drawing on a reference workset that is set to be off. typical worksets for this are Site, Mechanical, Electrical, and/or Design (This saves time from having to open every view and turning it off in unwanted time. This saves regeneration time. )
- Make sure the Autocad drawing is centered on the origin (0,0). (This avoids the annoyance of selecting a view and you select the wrong view because the view limits are bigger then the view because the origin of one of the detail components is a foot or 2 away from the detail.)
- Never explode Autocad files in Revit, trace the Autocad line work with Revit linework. (if you explode an Autocad file in Revit the Revit file will balloon in size which will make maneuvering within the Revit project frustrating)



